by Tampatundra on Wed Jun 28, 2017 6:22 pm
Jerry,
Thank you again, for your quick and thorough response. It is much appreciated.
In conclusion, regarding the horizontal furring on CMU construction:
Picture 1 shows the RMAX installed against the CMU wall, and the horizontal 1x4 furring installed on top of the RMAX. Is this a code compliant installation? Or, does the horizontal furring need to be installed onto the CMU wall, and the RMAX up to the bottom of the 1x4 furring?
"the draftstopping referred to in the code statement is the concealed space" But, the concealed space is filled with the RMAX foam board insulation (in the example whereby the RMAX is installed on top of the RMAX.
Thank you.