Building Code and Building Construction - Questions and Answers
Or when you want to know how construction is supposed to be done.

|
AskCodeMan.com
|
The following Codemen are available to answer your questions:
All Codes and Standards - Jerry Peck, Codeman


Q&A Board links
  • REGISTER

  • FAQ

  • LOGIN

  • Q&A BOARD INDEX

  • View New Questions

  • View Unanswered Questions

  • View Active Questions/Answers

  • Mark Questions as read

  • View Your Questions

  • Go To Your User Control Panel




  • Links to:
  • Construction Litigation Consultants


  • Florida Building Commission

  • Florida Building Codes Online


  • International Code Council

  • ICC Codes Free Online


  • Building Officials and Administrators of Florida




  • Product Approvals
  • Florida Product Approval

  • ICC Evaluation Reports Search

  • Miami-Dade NOA Search




  • Inspector and Contractor License Search
  • Search Florida Licenses




  • Technical links
  • Technical Information page


























































  • Contact Codeman



  • Custom Search

    Blower door testing in Multi Family Dwellings

    Blower door testing in Multi Family Dwellings

    New postby mtCDCcb on Tue Mar 08, 2016 6:08 pm

    Our municipality now requires a blower door test on residential buildings. This is new for 2016. With a single family dwelling its easy one house one test, but what do you do in a multi-family dwelling? If I have a 100 unit condo complex do I require 100 individual unit blower door tests? Any insight would be greatly appreciated.
    mtCDCcb
     
    Posts: 77
    Joined: Thu May 26, 2011 11:59 am

    Re: Blower door testing in Multi Family Dwellings

    New postby Jerry Peck - Codeman on Tue Mar 08, 2016 8:29 pm

    Yes, each unit needs to be tested individually.

    Some AHJs also require the common areas to be tested too as the common areas have their own systems.

    Better contractors will do three tests:
    - pre-insulation/drywall (sealed attics) as that allows the tester to identify leakage areas in the structural envelope
    - pre-insulation/drywall (after drywall lid for vented attics) for same reason

    - after drywall (easier to find and fix things before painting and finishes are applied/installed

    - after all work is complete (this would be the required test)

    The first two tests typically save the contractor/builder money by avoiding any work at the final required test.
    Jerry Peck - CodeMan
    AskCodeMan.com

    Construction and Litigation Consultant
    Construction Litigation Consultants, LLC.
    ConstructionLitigationConsultants.com
    User avatar
    Jerry Peck - Codeman
    Site Admin
     
    Posts: 1059
    Joined: Fri Dec 12, 2008 12:06 pm


    Return to Energy: Energy code questions



    Who is online

    Users browsing this forum: No registered users and 1 guest



    www.AskCodeMan.com
    cron