Building Code and Building Construction - Questions and Answers
Or when you want to know how construction is supposed to be done.

|
AskCodeMan.com
|
The following Codemen are available to answer your questions:
All Codes and Standards - Jerry Peck, Codeman


Q&A Board links
  • REGISTER

  • FAQ

  • LOGIN

  • Q&A BOARD INDEX

  • View New Questions

  • View Unanswered Questions

  • View Active Questions/Answers

  • Mark Questions as read

  • View Your Questions

  • Go To Your User Control Panel




  • Links to:
  • Construction Litigation Consultants


  • Florida Building Commission

  • Florida Building Codes Online


  • International Code Council

  • ICC Codes Free Online


  • Building Officials and Administrators of Florida




  • Product Approvals
  • Florida Product Approval

  • ICC Evaluation Reports Search

  • Miami-Dade NOA Search




  • Inspector and Contractor License Search
  • Search Florida Licenses




  • Technical links
  • Technical Information page


























































  • Contact Codeman



  • Custom Search

    Florida Energy Conservation Code 2010

    Florida Energy Conservation Code 2010

    New postby RobShepp on Thu Nov 20, 2014 6:14 pm

    Jerry,
    I recently changed my inspections from just checking for permits to actually visiting the Building Department on every job, reguardless of the build date of the structure. One of the things that interests me is new structures, I'm starting to get a better client base from attorney referals. That being said, one thing really interested me about the Florida Energy Conservation Code. Specifically, the difference between 401.2 compliance 1 & 2 and what I should look for in the paperwork at the Building Department. The structure was built in 2014(completed in August) and had EPL cards for 2 5 ton A/C systems with R-6 ductwork in the non-conditioned space(attic). During construction, the 2-5 ton system was changed to 3 systems, 2-3 ton systems and 1-5 ton system, but the EPL cards were never changed. I questioned the city inspector on why they allowed the system to be oversized by 1 ton compared to the EPL cards and was told over-sizing of the A/c's by 15% is allowed. We know that's not true, as acca manual-s is required based off of the manual-j load calculations per 403.6.1. Also, there was no documentation as required to show compliance with 405, so the ductwork should have been R-8 in unconditioned space. I just want to make sure I understand this portion of the code properly and what documentation should be available to show compliance.

    thanks again.
    RobShepp
     
    Posts: 22
    Joined: Sat Oct 04, 2014 8:56 am

    Re: Florida Energy Conservation Code 2010

    New postby Jerry Peck - Codeman on Thu Nov 20, 2014 9:26 pm

    Rob,

    Talk with Tom Glynn on the energy stuff. We've had a few conversations on the energy forms but Tom has taken it to a higher level and investigated the forms more deeply than I.
    Jerry Peck - CodeMan
    AskCodeMan.com

    Construction and Litigation Consultant
    Construction Litigation Consultants, LLC.
    ConstructionLitigationConsultants.com
    User avatar
    Jerry Peck - Codeman
    Site Admin
     
    Posts: 1103
    Joined: Fri Dec 12, 2008 12:06 pm


    Return to Energy: Energy code questions



    Who is online

    Users browsing this forum: No registered users and 1 guest



    www.AskCodeMan.com