Using meter can as a pas thru to load center
Posted: Mon Feb 03, 2014 8:21 pm
Hi Jerry, I saw a feed to a well pump for irrigation wired thru a meter can to the loadcenter on the adjacent wall in the garage today. As this is not typical it seems like it may not be proper.
Can the AHJ ok something like this? The owner stated a permit was pulled but all I can find is the original irrigation subs permit with no specific info available online at PBC building department. As well permits are hard to get when you already have city water, the breaker looked slightly different from the others meaning I don't think it was installed with the others and it was not identified. Doesn't feel right.
What say you.
David
Can the AHJ ok something like this? The owner stated a permit was pulled but all I can find is the original irrigation subs permit with no specific info available online at PBC building department. As well permits are hard to get when you already have city water, the breaker looked slightly different from the others meaning I don't think it was installed with the others and it was not identified. Doesn't feel right.
What say you.
David