Building Code and Building Construction - Questions and Answers
Or when you want to know how construction is supposed to be done.

|
AskCodeMan.com
|
The following Codemen are available to answer your questions:
All Codes and Standards - Jerry Peck, Codeman


Q&A Board links
  • REGISTER

  • FAQ

  • LOGIN

  • Q&A BOARD INDEX

  • View New Questions

  • View Unanswered Questions

  • View Active Questions/Answers

  • Mark Questions as read

  • View Your Questions

  • Go To Your User Control Panel




  • Links to:
  • Construction Litigation Consultants


  • Florida Building Commission

  • Florida Building Codes Online


  • International Code Council

  • ICC Codes Free Online


  • Building Officials and Administrators of Florida




  • Product Approvals
  • Florida Product Approval

  • ICC Evaluation Reports Search

  • Miami-Dade NOA Search




  • Inspector and Contractor License Search
  • Search Florida Licenses




  • Technical links
  • Technical Information page


























































  • Contact Codeman



  • Custom Search

    Drainage Vent placement

    Drainage Vent placement

    New postby Dave F on Fri Feb 12, 2016 10:58 am

    Hello,

    I'm considering doing an addition to my home which will include a master BR and bath. the home currently only has one bathroom. I will be doing most of the work myself. The current structure is a 2 story colonial, the proposed addition would be only one story on the east side of the home. My question is the placement of the through the roof sewer vent. There are 3 windows on the existing home on the side of the proposed addition, all are above the proposed roof of the addition. Does the proposed vent pipe need to be both above and over 10' away from any window, or is it one or the other. I will say that the highest window in the attic, could be considered non-openable. I can get the vent 10' away from the windows, but to also be above them would mean a ridiculously tall vent.
    Dave F
     
    Posts: 11
    Joined: Wed Feb 10, 2016 12:15 pm

    Re: Drainage Vent placement

    New postby Jerry Peck - Codeman on Fri Feb 12, 2016 10:12 pm

    Dave,

    A plumbing vent terminal is required to terminate as follows:
    - at least 10 feet horizontally from (if horizontally from or below)
    - or
    - at least 3 feet above

    any door, operable window, or any intake opening (which includes soffit vents).

    The "or" is an important part and sounds like it will make it work for you.
    Jerry Peck - CodeMan
    AskCodeMan.com

    Construction and Litigation Consultant
    Construction Litigation Consultants, LLC.
    ConstructionLitigationConsultants.com
    User avatar
    Jerry Peck - Codeman
    Site Admin
     
    Posts: 1088
    Joined: Fri Dec 12, 2008 12:06 pm


    Return to Plumbing: Water heaters, fixtures, traps, hose bibbs, water pressure, supply & DWV piping



    Who is online

    Users browsing this forum: No registered users and 1 guest



    www.AskCodeMan.com
    cron