by Jerry Peck - Codeman on Tue Apr 13, 2010 11:27 pm
Hi Steve,
By the permitting part I mean that all structures are submitted for their type of construction in the same manner, the architect/engineer designs the structure and submits the plans for review. When approved, all with the same process, the construction begins and the inspection is the same as regards to the inspection sequences, with differences in inspection protocols based on the type of construction being inspected with regard to the structure, however, the mechanical, electrical, plumbing inspections are all essentially the same based on what is present/not present.
The differences, then, between all concrete block, all frame, and concrete block/frame come down to the submitted design difference and as it was reviewed and approved. The inspections take place based on the approved drawings.
I am located in Ormond Beach but go all over Florida and the Southeast time and scheduling permitting.
Jerry Peck - CodeMan
AskCodeMan.com
Construction Litigation Consultant - Retired
Construction and Code Consultant - Semi Retired